The shareholders of the Tsaritsino residential complex, building 35, are obduren. Not all investors can move in at the Tsaritsino residential complex.

Technologies

Around the problematic housing complex “Tsaritsino” there is a lot of experience with the shareholders.

At his place, the intercessor of the head of Moskombudinvest, Katerina Khramova, found out that the 35th building is self-made.
Behind the building, the address is: st.

6-a Radialna, ow.

7 – all necessary and permissible documentation is required.

Previously, the forgetter went to the Local Land Commission of Moscow with food about the transfer of the building.

35 from the non-residential fund from the residential fund.

According to another plan for the construction of the Tsaritsino residential complex, according to the words of a representative of the Mosotdelbud No. 1 JSC, on September 25, 2018, the company plans to print the lining of the buildings.

“We intend to complete our work within a month, and the work will begin, based on the confirmed schedule, at the end of the day,” said Volodymyr Egorov.

Recently, Kostyantin Timofeev reported that the existence of modern engineering measures is also the new local oblivion.

“Merezhi, which is not enough to be a place, e.

Rashta is the headquarters of the AT “Mosotdelbud No. 1”.

Financing for this type does not work.

The development of the residential complex “Tsaritsino” at the address: 6-a Radialna street, Volodinnya 7, began in 2006 from the receipt of funds from citizens for share participation agreements.

During the hour of implementation of the project, 4017 shareholding agreements were signed for the residential complex "Tsaritsino", 3265 shareholding agreements were not entered into, and the rest of the shareholding of the residential complex was assigned.

“Tsaritsino”, which is at Biryulyovo, on the day of Moscow, is an ongoing project. The territory, buildings, infrastructure are large - this is an independent quarter. Only the owner of his BAT “Moscow Bakery Plant” has not been involved in development activities and has not paid dividends.

What is currently expected from the residential complex and who will end the capital’s longest life?

Apparently, among the Cossacks, good overcomes evil.



Life never ends again. Sometimes those things that looked so good on the paper and in the garb of the forgotten ones are transformed into sums, into the fate of ill health, into wasted pennies, disappointment and tears. This is what happened to the residential complex standard class"Tsaritsino".
As the classic says, “your butt is another science.”.

Perhaps, the forgetters, who thought that this was how the story of the “Moscow Bakery Plant” ended, should respect their duties, invest their resources, and not engage in unnecessary actions. Why did it all start.


And everything began

VAT "Moscow Bakery Plant"

. This business is steeped in history: it began to function in the 30s of the last century. At Stolitti XXI "MCG" was part of a great holding with the unproven name “Nastyusha” with simply obscene tricks.


At first, the shareholders believed the claims, then they became overwhelmed and demanded justice.

However, after several transfers of terms, the situation only became worse.

Contractors cheated, forgotten, ignoring the charges and benefits of shareholders, being cunning and wise, misleading potential buyers, trying to create a prosperous picture.

Unfinished buildings were abandoned, and new ones began to be built.

Right in the middle of the residential complex, apartments were sold in several small buildings (apartment complex "Star-Format", complex "Studio-Kvartal").

When it became impossible to close one’s eyes to the situation from “Tsaritsino”, the authorities of the state intervened before it. In 2017, the head of the BAT “Moscow Bakery Plant” of Igor Pinkevich was arrested. He paid an astronomical amount to his shareholders – close to 20 billion rubles.


From the stipulation of the shareholding agreements, and there were over 4000 in total, there were 761.

Ways out

In the spring of 2018, the fate of VAT “MKG” was declared bankrupt

.

Also, the capital’s measures, Sergei Sobyanin, brought the situation with “Tsaritsino” under control, allowing them to enter the register of borrowed shares and find out how much to finance the project.


The conservation of the under-resourced buildings, which had been standing in such a camp for many years, began.

The project includes over 4,000 apartments, among them studios, and one-, two-, three-, and four-room options. Planning, Honestly, apparently, even more and more filth- Spacious, ergonomic, with close-to-square rooms, with five-room living rooms or bedrooms, balconies and loggias with curtain walls, an organically audible hallway.






Right from the start, as many as three types were introduced – “Country”, “Classic” and “Mediterranean”.

Now, of course, there’s no need to talk about procurement: I’d like to get everything and put the building into operation.

The parking lots in “Tsaritsino” were planned to be very diversified – both underground courtyards, and above-ground ones, and open to guests. The mesh of these eight buildings, which overcame the buildings, the first "Tsaritsino" became a long-term life, on one side, of course, the lucky ones - the stench was taking away its life. Otherwise, it’s not so much happiness, but even From four children's cages, Nina produces one(just don’t bother a couple of private ones). Offense at school,


who were excited about the project,

There are also no daily shopping centers, clinics and two colleges (so, so and so!).



The infrastructure of "Tsaritsino" is represented by children's squares and shopping areas on the first surfaces of these buildings, which are part of the building. Accurate ecology

Tsaritsino metro station is within walking distance Vіd LCD: no skin is ready to work today for such a trivial walk. The Biryuliovo-Tovarna station is located 2 kilometers away.

Motorists should take care that the distance to the Garden Circle is 18 kilometers, to MKAD – 5 kilometers Proceeding to exit there along Lipetskaya Street is problematic, there are traffic jams. Want Biryulyovo district Shidne greens, Just 300 meters away lies the Tsaritsino Dachne fry park-garden.


, the trojan of the winds here strikes the best. Entrust TEC, for a per kilometer plant of reinforced concrete inoculants, not so far away is the Smitte smelting plant.

Residential complex "Tsaritsino" is one of the largest developments in Moscow.

Construction began in 2008, and the construction date for the project was initially set for 2012.

Until then, only 6 out of 15 units were put into operation, which were planned for the first time.

  • Another district has designed 11 more residential buildings.
  • Ale Budivnitstvo was frozen.
  • About the project
  • The new microdistrict is being built on the territory of a large bakery plant.
  • The project transferred the work of eighteen surface monolithic-cement buildings and water infrastructure facilities, which include:

children's kindergartens;

schools;

clinic;

sports complex;

shopping center

Children's and sports squares may be installed in the courtyards, maintenance zones will be created, walking paths will be laid.For vehicles, underground parking and surface guest parking are planned.

Novobudova has excellent transport accessibility.

There are 2 metro stations nearby, the distance to the Moscow Ring Road is 5 km. The complex has one-room, two-room, three-room and four-room apartments ranging from 43 to 100 square meters.

meters

After the bankruptcy proceeding, the shareholders of the Tsaritsino 2 residential complex may submit applications to the arbitration court for their inclusion in the register of creditors of MKG.

  • The application must specify the need:
  • transfer of living quarters;
  • penny money;

knowledge of the right to power.

  • The documents should be sent directly to the name of the competitive agent – ​​D.V.
  • Panchenko.
  • After the inclusion of payments to the Register, there are possible options for the development of the following:
  • Dobudova ZhK pіd hour of bankruptcy procedures;

transfer of the Novobudovo ZhBK, of which the participants of the Budivnytsia will become members;

sales of non-rukhomost from trades from the current division of the proceeds between the participants of the event;

confession of another forgetter.

All interested parties must appear at the court hearing and submit original legal documents to the court.

Insurance according to DDU

Within the boundaries of Federal Law No. 214-FZ, the obligatory insurance of the debtor's liability to the payers has been transferred.

This change has come to a head since 1st June 2014.

There are 2 metro stations nearby, the distance to the Moscow Ring Road is 5 km. The bankruptcy of a forgetter is an insurance policy.

In this way, residents who have laid a preschool education can contact the insurance company Proimnstrakh LLC for payment of insurance premiums.

  • Korisno: The liability of VAT “MKG” for non-compliance with the share participation agreement with Budivnytsia was insured except for buildings No. 27, 28, 29, 30 and 31.
  • The twenty-high booths at “Tsaritsino 2”, building 35, will not be used as housing stock, but as apartments, leveled to non-residential facilities.
  • As of today, the readiness of the facility is less than 12%.
  • The shares that were deposited with the civil servants’ corps are not protected by the norms of 214-FZ, and are deprived of a third party by creditors.
  • For apartment owners, this means that the unfinished property will be sold at auction, and compensation will be paid to the established amount.
  • Zabudovnik repeatedly informed people that building 35 would be transferred to the housing stock, but the construction of Vikonana would not happen.

For the rest of the news about the residential complex “Tsaritsino 2” building 35, it became clear that the decision to include the production of this object was praised.

With the help of a burner, the soundness of this booth was increased by nearly 500 people.

Moskombudinvest stated that the supply of shares to the 35th building is determined on an individual basis.

Respect: Retirement takes away the physical person, the damages of the legal functions that were invested in everyday life are not compensated.

Who will get the residential complex

The bankruptcy of VAT "MKG" allowed the residential complex "Tsaritsino" to be transferred to another recipient.

The Moscow City Government has indicated that it will obtain the object of the AT “Mosotdelbud No. 1”.

The company was founded in 1937.

The main types of activity of the company are daily life and improvement of municipal infrastructure facilities.

The income will be obtained from funds received from the local budget.

According to recent data, the required investments amount to over 50 billion rubles.

The legal procedure for transferring an object to a new recipient takes 2-3 months.

Only after this “Mostilbudbud No. 1” can we start before our daily work.


The Tenth Arbitration Court of Appeal found one of the investors in the building of the 35th building of the Tsaritsino residential complex to be included in the registry and was able to transfer the residential premises within the framework of the bankruptcy of the developer to the project - AT "Moscow Comb" Inat of bakery products" (MCG).

Please refer to the materials for details.

As explained by the partner of the law firm “Povereniy” (representing the interests of 220 of the 490 joint investors in the 35th building) Danilo Sinitsin, at the same time the court of the first instance turned to the previously suppressed view Other similar applications.

According to Moskombudinvest, the transfer of the 35th building to “Mosotdilbud No. 1” is impossible: according to the law, the company can only complete the residential facility.

I will be administratively aware that another mine of the MHC can now be put up for auction.

Danilo Sinitsin says that the 35th building is immediately ready to increase 12% (131.6 thousand sq. m could have been covered).

your connection, fortunately there are no other online services, including Yandex.

According to estimates by Colliers International, the property's value may reach 1.1 billion rubles, and the total sales volume of space will reach 6.8 billion rubles.