For whom it is necessary to join the SRO. Does your company need to join the SRO? Wiring of manual, mechanical and automatic barriers, gates, gates, turnstiles, lance barriers

Already a few years ago, the lifelong partnership began to talk about the fact that the self-regulatory system we know will soon come to an end. Let the heads of self-regulatory organizations fly about (and with them, in an unknown direction, fly to collect pennies). And then the axis-axis will all become completely different. Now it has become clear that in 2017, the events of 2017 have become a reality. At […]

  • The boy shouted “Vovki” for a long time. So axis, gentlemen: Vovki. This is far from being a completely self-regulatory organization, which is excluded from the Rostechnaglyad register due to the instructions of the National Social Security. It’s not the first time that hundreds of careless workers in companies are left without permission, thousands of workers are left without work, and more than a thousand members of their families are left without the right to sleep (and all that […]

  • The willingness to join the SRO is one of the first signs of a self-regulatory organization that will earn you respect. It is, of course, not your rules to overpay for the same speeches twice or more. However, if it weren’t according to your rules, you would hardly become a successful businessman, wouldn’t that be so?

  • How many crooked tears have already been shed over the drive of regionalization... And even regionalization is not a single rotten apple, which the legislators brought to 372-FZ. Another “unified register of specialists”. Everyone worries about this innovation. Budivelnikov, to move to regional SROs. Budivniki, don’t go anywhere. The regionalization did not affect the designers and researchers. Vimogi to fakhіvtsіv with [...]

  • That's it, sir. All notifications are accepted, notifications are not accepted. The last term of their serving was 1 breast. What does this mean for those who have achieved and for those who have not achieved? What are you going to do? Let's get along. The first stage of changes associated with the transition to regional self-regulatory organizations has been completed. At this stage, it was necessary for the alarmists to praise the decision [...]

  • Read also

    On the song, the work permit is not required. The required SRO approval for your organization can be determined by reading the list below.

    This type of work does not require SRO approval for two reasons:

    • When they are carried out on simple objects, they should NOT be carried out on particularly unsafe, technically complex or unique objects.
    • Because this work, in principle, does not lie until capital activity. The range of types of work that must be carried out until the capital work can be seen in 624 orders of the Ministry of Regional Development dated 12/30/2009. You see, it works so you don’t lie down until the cap. everyday life, listed on this side, folded “like a collar”, relying on 624 penalties and not prescribed anywhere in the law.

    A variety of types of work that do not affect the safety of capital utility facilities and do not require SRO approval

    1.1.1. Control of electrical lighting systems for time alarms.

    1.1.2. Vlashtuvannya timchasov zahisnyh gardens.

    1.1.3. Geodesic splitting base for everyday life.

    1.1.4. Geodetic control of the accuracy of geometric parameters of bodivel (spores).

    1.1.5. Binding robots in the process of work (the required tolerance is only required when working on particularly unsafe objects).

    1.1.6. Cleaning of premises and territories (cleaning) after carrying out routine and repair work

    1.2. The work involved in the construction and disassembly of the structure:

    1.2.1. Dismantling (dismantling) of walls, walls, ceilings, marches, maydanchiks, gatherings, dismantling of windows, doors and gates, partitions, hanging frames and other structural elements and related elements or their parts n. especially unsafe objects).

    1.2.2. Breaking apart walls, massifs, ceilings, punching nests.

    1.2.3. Selects the ground part of the boudivel plant.

    1.2.4. Dismantles sidewalks, subfloors, roofing and cladding.

    1.2.5. Disassembly of industrial furnaces.

    1.2.6. Analyzes the processing of tunnels from chavun tubings.

    1.2.7. Dismantling of metal columns, beams and frames.

    1.2.8. Dismantling the contact line supports.

    1.2.9. Clearing the territory and preparing them until they are forgotten.

    1.2.10. Installation and dismantling of external and internal equipment, technological plumbing lines (the required tolerance is only required when working on particularly unsafe objects).

    1.2.11. The daily routine of the hour: roads; Maidanchikov; engineering measures and disputes.

    1.3. Works on excavation of screeds, vertical planning, strengthening of natural soils and watering of soil cushions:

    1.3.1. Excavation of soil with excavators in excavations, pits, trenches and dumps or pits.

    1.3.2. Excavation of the soil with excavators for the purpose of transport and transportation.

    1.3.3. Excavation and movement of soil using bulldozers and scrapers.

    1.3.4. Digging holes using a mechanized method, digging trenches with an excavator and a trencher.

    1.3.5. Paving the slopes with stones and slabs with padded stops.

    1.3.6. Replacement of water drainage channels with trays - gutters, boards, shields and mats with lashed heads.

    1.3.7. Compacting the soil with compactors, compacting machines or important rammers.

    1.3.8. Removing the frozen ground with a wedge - with a woman, with fluffers and drilling rigs.

    1.3.9. The gate fills the soil manually with reinforced electric or pneumatic rammers.

    1.4. Work on the construction of manholes and caissons:

    1.4.1. Lowering the wells with mechanized soil breaking.

    1.4.2. Lowering the well manually.

    1.5.1. Folding of living and huge buildings from parts of factory-prepared complete production.

    1.5.3. Folding of coatings and re-critics.

    1.5.4. Installation of wooden structures, frames, roofs, stilts, beams, arches, trusses and panels.

    1.5.5. Installation of canopies, backlash - closets, floor drawers, tables.

    1.5.6. Installation of rows, future disassembly of slipways.

    1.5.7. Installs conductors, exit ladders, walking boards, and barriers.

    1.5.8. Washing of walls with wooden structures and parts.

    1.6. Robots involved in the installation of light structures that will be stolen:

    1.6.1. Installation of arbolite and asbestos-cement slabs and wall panels, coatings.

    1.6.2. Washing of walls, ceilings, partitions and parasols from asbestos-cement sheets on the finished frame.

    1.6.3. Installation of blasting blocks made from asbestos-cement sheets.

    1.7. Robots using stone structures:

    1.7.1. Washing of the structure on purpose, including cladding (required tolerance only when working on particularly unsafe objects).

    1.7.2. Washing of partitions with purpose, ceramic stone, piece gypsum and lightweight concrete slabs.

    1.7.3. The jumper has been installed.

    1.7.4. The construction was made from natural and pieced stone, including cladding (required clearance only when working on particularly unsafe objects).

    1.7.5. Laying walls from ceramic stone, foam concrete, aerated concrete and expanded clay concrete blocks.

    1.7.6. Laying the structure from natural and piece stone.

    1.7.7. Installation of round formwork for laying arches, crypts and walls of industrial furnaces.

    1.7.8. Laying foundations, basement walls, retaining walls, laying rubble stones.

    1.7.9. Laying of integral channels, pits, furnaces, caverns, chimneys with chips.

    1.8. Work with screen placement and cleaning of expansion joints:

    1.8.1. Sealing of horizontal and vertical joints and seams between panels, windows, doors.

    1.8.2. Washing of deformation and anti-seismic seams.

    1.8.3. Screening of frames, walls, doors, floors with copper or steel sheets and mesh.

    1.8.4. Installation of dry steel screens.

    1.8.5. Wall cladding and roofing are made from sheet steel.

    1.9.1. Washing of roofs made from piece and sheet materials (required tolerance only when working on particularly hazardous objects).

    1.9.2. Washing of self-leveling coatings (required tolerance only when working on particularly unsafe objects).

    1.9.3. Washing of asbestos-cement roofs.

    1.9.4. Lashing of roof tiles with a grating attachment.

    1.9.5. Washing of rolled roofing (required tolerance only when working on particularly unsafe objects).

    1.9.6. Washing of the roof with bitumen mastic with a sloping or sloping layer.

    1.9.7. Washing of other roofing coatings and finishing on the facades from the roofing strip.

    1.9.8. The gutters and fences were covered with handrails.

    1.9.9. Priming the bases and treating the vapor barrier.

    1.10. Works with anti-corrosion protection of everyday structures and equipment:

    1.10.1. The surface is coated with varnishes, farbs, and enamels.

    1.10.2. Metallurgy of steel structures, including bridges, supports, poles, towers.

    1.10.3. Hydrophobization and fluorination of the surface.

    1.10.4. Infiltration of crushed stone with “BITUMINOL N-2” mastic.

    1.11. Work on thermal insulation of building structures, pipelines and equipment:

    1.11.1. Works on thermal insulation of pipelines.

    1.11.2. Covering the surface of the insulation of pipelines with asbestos-cement casings, sklocement, skloplastik, sklotekstolite.

    1.11.3. Covering the surface of the pipeline insulation with sheet metal or corrugated aluminum sheets.

    1.11.4. Covering the surface of the insulation of pipelines, burning and gluing the insulation with spitting materials, fabrics, and rolled materials.


    1.12. What is the required SRO approval for plumbing work? Work with control of internal engineering systems and equipment that does not require SRO approval:

    1.12.1. Laying internal electrical wiring.

    1.12.2. Control of the electrical system with voltage up to 1 kV inclusive.

    1.12.3. Installation of access-and-spreader annex.

    1.12.4. Installation of distribution and lighting panels, terminal boxes and accessories.

    1.12.5. Installation of cabinets, remote controls, shelving.

    1.12.6. Installation of switches, switches, automatic ventilators, plug devices.

    1.12.7. Installation of ballast and direct control equipment.

    1.12.8. Installation of electrical accessories and medical devices.

    1.12.9. Installation of grounding devices.

    1.12.10. Installation of isolators.

    1.12.11. Lays cables that are secured to cables or staples.

    1.12.12. The control of electrical and other measures for controlling life safety systems will be carried out in the future.

    1.12.13. I install flash lines, cable ducts, hatches, ramps, and a checkpoint on supports and towers.

    1.12.14. Installs parts for lightning protection and contour grounding.

    1.12.15. Installation of short-circuiters, disconnectors, breakers, surge arresters for voltages up to 750 kV.

    1.12.16. Installation of batteries, empty batteries from chargers.

    1.12.17. Installation of electric heating units, electric stoves.

    1.12.18. Installation of embedded and additional components of automation systems, fire extinguishing installations, and installation of thick butter systems.

    1.12.19. Replenishment of containers with foaming agents.

    1.12.20. Installation of fans and ventilation units, tidal exhaust chambers, maintenance, verification, recirculation.

    1.12.21. Cleaning and dismantling of the ventilation and air conditioning systems.

    1.12.22. Installation of air heaters and heaters.

    1.12.23. Installs filters, scrubbers, cyclones.

    1.12.24. Installation of wind collectors made of steel pipes and wind drains and hydraulic valves.

    1.12.25. Vlashtuvannya and dismantling of the scorching system.

    1.12.26. Installation of scorching hot water and steam water boilers.

    1.12.27. Installation of scorching sections of steam cauldrons.

    1.12.28. Inspection and dismantling of the water supply and sewerage systems.

    1.12.29. Laying pipelines from plastic and metal-plastic pipes.

    1.12.30. Lays pipelines from colored metals and chavun.

    1.12.31. Laying pipelines from steel pipes, welded joints and installed inlets.

    1.12.32. Lays pipelines from steel pipes with flanges and welded joints from ready-made assemblies and parts.

    1.12.33. Installation of shut-off, control and external valves on internal walls.

    1.12.34. Installation of water supply units, water treatment units and water treatment units.

    1.12.35. Installation of compensators.

    1.12.36. Installation of elevator units.

    1.12.37. Installation of container accessories (pressure gauges, thermometers, level indicators, drainage taps).

    1.12.38. Installation of vice and reduction regulators.

    1.12.39. Installation of subcentral pumps with piping.

    1.12.40. Installation when laying pipelines of filters, water-oil and oil-fillers, compensators, bypass devices.

    1.12.41. Installs water filters, softens and improves water storage.

    1.12.42. Installation of water heaters, liquid and chemical water heaters, installation of boilers.

    1.12.43. Cut-in and connection of pipelines to existing mains.

    1.12.44. Installation of risers in finished channels on surfaces with installed shields.

    1.12.45. Installation of water-driven steam combs made of steel pipes.

    1.12.46. Installation of distribution boxes, display units, brackets, stands, vibration-insulating bases, valves, flaps, sealed doors and hatches.

    1.12.47. Cut-in fittings and tri-pieces at the open edge, connecting and plugging gas pipelines (according to the evidence of the fakivts, who refused to allow Rostekhnaglyad to do this type of activity).

    1.12.48. Testing of hydraulic and pneumatic pipelines for the first time allowed Rostekhnaglyad to look at this type of activity.

    1.13. Work on the installation of external engineering lines and communications:

    1.13.1. Vlashtuvannya electrical supply voltage up to 1 kV inclusive.

    1.13.2. Control of external lines, including telephones, radio and television.

    1.13.3. Lashing of pipelines using the method of horizontal straight drilling.


    1.14. What is the required SRO approval for installation work? Work on the installation of technological equipment, which does not require SRO approval:

    1.14.1. Installation of electrical installations.

    1.14.2. Installation of compressor machines, pumps, pumping units for heating purposes and fans.

    1.14.3. Installation of compressor units and piston and sub-central expanders.

    1.14.4. Installation of ventilation equipment.

    1.14.5. Installation of communications equipment, telephone exchanges and switchboards of the director's MB system, dispatch and installation communications, telephone and quasi-telephone stations.

    1.14.6. Installation of accessories, automation features and computing equipment.

    1.14.7. Installs indicators, sensors, alarms for various parameters.

    1.14.8. Installation of equipment for operational control and management, collection and transmission of output information.

    1.14.9. Installation of panels, shields, tripods, remote controls.

    1.14.10. Installation of video security systems.

    1.14.11. Installation of control and access control systems.

    1.14.12. Installation of electrical alarm, fire alarm, alarm and remote alarm equipment with interlocking surfaces.

    1.14.13. Installation of equipment for agricultural production plants.

    1.14.14. Installation of equipment for food processing enterprises.

    1.14.15. Installation of equipment for industrial enterprises and connections.

    1.15.16. Installation of equipment for the connection of mines and transport transport.

    1.15.17. Installation of electronic equipment.

    1.15.18. Installation of equipment and facilities for household services and municipal government.

    1.15.19. Installation of equipment for health protection and medical industry.

    1.15.20. Editing of possessed cinematography.

    1. 15. What is the required SRO approval for commissioning? Start-up work that does not require SRO approval:

    1.15.1. Commissioning of electrical devices.

    1.15.2. Commissioning of automation robots in electrical systems.

    1.15.3. Commissioning of automated cleaning systems, alarm systems and interconnection devices.

    1.15.4. Commissioning of software for computing complexes.

    1.15.5. Commissioning robots for autonomous adjustment of systems.

    1.15.6. Start-up and commissioning of robots for complex adjustment of systems.

    1.15.7. Commissioning of mining robots and testing of ventilation and air conditioning systems.

    1.15.8. Commissioning of refrigeration units.

    1.15.9. Start-up of thermal power equipment robots.

    1.15.10. Commissioning of hot water heating boilers.

    1.15.11. Commissioning of boiler robots - additional equipment.

    1.16. What is the required SRO approval for the warehouse? No work required:

    1.16.1. Installation of window and door blocks.

    1.16.2. The walls are double and triple, including glass panels, window and balcony blocks.

    1.16.3. Single walls, including glass packages, greenhouse palettes, industrial walls and partitions.

    1.16.4. Sliding door panels and stained glass windows with a glass slide.

    1.16.5. Covering roofs, walls, partitions with polymer materials.

    1.16.6. Control of input groups.

    1.16.7. Wiping of office partitions.

    1.17. What is the required SRO approval for construction and plastering work? For work described below, SRO approval is not required:

    1.17.1. Plastering of internal and external surfaces was carried out.

    1.17.2. Vibration is essential and preparation of the surface for preparation or taping with trellises.

    1.17.3. Plastering the surface of facades on stone and concrete.

    1.17.4. Plastering stoves with clay mortar.

    1.17.5. The plaster and screed are X-ray resistant.

    1.18. Vlastuvannya fundamentals, coverage and subtext:

    1.18.1. Vlashtuvannya screeds.

    1.18.2. Vashtuvannaya lining from linoleum and plastics.

    1.18.3. Vlashtuvannya for parquet floors, panels and boards.

    1.18.4. Washing the floor from ceramic, porcelain stoneware, granite and marmur slabs.

    1.18.5. Vashtuvannya for seamless, polymer, polymer-cement.

    1.18.6. Washing of epoxy self-leveling substrate.

    1.18.7. Vashtuvannya sports undercovers.

    1.18.8. Weathering of artificial lawns and sports surfaces of stadiums and sports squares.

    1.18.9. The floor and the ceiling are covered with concrete and mosaic tiles.

    1.18.10. Washing of stone and brook coatings.

    1.18.11. Vlastuvannya of soil bases, earthen and crushed stone coatings.

    1.18.12. Vlastuvannya iz of chavun and steel stamped tiles.

    1.18.13. Washing of asphalt concrete and xylolite coatings.


    1.19. What is the required SRO approval for facial procedures? For this list of workers with lining, SRO approval is not required:

    1.19.1. Covering the surface with gypsum and gypsum fiber sheets.

    1.19.2. The surface is covered with ceramic slabs.

    1.19.3. The surface is covered with marmur, piece marmur, granite, piece granite.

    1.19.4. Installation of hanging racks.

    1.19.5. Covering the walls with siding.

    1.19.6. Wall cladding with composite materials and plastic.

    1.19.7. Covering the walls with wall and stele panels, clapboard, false beams.

    1.19.8. Lining the stoves and lining them with stones.

    1.19.9. Cladding of wall and floor frames with acoustic slabs and materials.

    1.19.10. Covering the surfaces of walls, columns, pilasters with natural and pieced stone.

    1.19.11. The surface of the walls and floors is covered with chipboard, wood-fiber boards and plywood.

    1.19.12. Covering the walls and floors with duralumin sheets.

    1.19.13. Work on the installation of walls from panels of the “SANDWICH” type and sheet folding.

    1.19.14. Ventilation of ventilated facades.

    1.20. What do you need for molded robots? On those indicated below, no

    1.20.1. Installation of polymer, gypsum and cement moldings.

    1.20.2. Installation of polymer, gypsum and cement piece parts, rosettes, capitals, bases, cones, crackers, brackets, mounts, vases, coats of arms.

    1.21. Other construction, painting and trellis robots:

    1.21.1. Installation of doors, design of door openings.

    1.21.2. Vlashtuvannya tension steles.

    1.21.3. Installation of commercial equipment, shelving and fencing.

    1.21.4. Vlashtuvannya warehouse equipment.

    1.21.5. Installation of lamps and lighting equipment.

    1.21.6. Installation of external lighting fixtures was carried out quickly.

    1.21.7. Installation of sanitary fittings.

    1.21.8. Washing of sanitary partitions.

    1.21.9. Installation of safes.

    1.21.10. The façades and external surfaces were sealed.

    1.21.11. Sealing of external surfaces of reinforced concrete structures.

    1.21.12. Barred in the middle of the premises.

    1.21.13. Covering walls, floors with trellises, lincrust, fabrics, cork and other materials

    1.22. What is the required SRO approval for the fence and fence? For a fence that is on the list, SRO approval is not required

    1.22.1. Wiring of manual, mechanical and automatic barriers, gates, gates, turnstiles, lance barriers.

    1.22.2. Vlastuvana of dry and decorative fences, fences, fences made from various materials, including dry fences and elements of the everyday life of highways and fence structures was created and sporuded.

    1.22.3. Vlashtuvannya zahisno and zahisno-decorative vegetable gardens.

    1.22.4. Installation of snow shields and fences made from them.

    1.22.5. Installs additional reinforced concrete footings.

    1.23. Landscaping, drying and fruit plantings, landscaping of the territory:

    1.23.1. Planting tea trees with preparation of planting sites and planting material.

    1.23.2. Planting seedlings and seedlings.

    1.23.3. Tree planting of seedlings and saplings has been mechanized.

    1.23.4. Weeding lawns, lawns and keeping an eye on them.

    1.23.5. Aerosia of coniferous trees.

    1.23.6. Watching the trees and chagarniks.

    1.23.7. Processing of soils, including the contributions made.

    1.23.8. Vlashtuvannya watering systems and roshennya.

    1.23.9. Installation and dismantling of trellises, posts, stops, anchors and braces.

    1.23.10. Cover the terrace with wood and composite decking.

    1.23.11. The greenhouse is covered with various materials.

    1.23.12. The cleansing of the children's Maidans, the place of allowing and fixing, the place of huge corruption.

    1.23.13. Installation of small architectural forms, fountains, artificial water bodies.

    1.23.14. Vashtuvannaya smitte container maidans.

    1.24. Inspection of road foundations and coatings for motor roads and airports:

    1.24.1. Washing of cobblestones and mosaic pavements, Maidans, paths

    1.24.2. Washing of concrete slab sidewalks and paths

    1.24.3. Attachment of vibrating balls from asphalt

    1.24.4. Impregnation of bases and coatings from asphalt concrete mix

    1.24.5. Washing of cement-concrete bases and coatings

    1.24.6. Installation of side stone

    1.24.7. Appliance paving

    1.24.8. On-line repair of the morning roads

    1.24.9. Wetting of bases and coatings from clay-gravel mixture

    1.24.10. Washing of crushed stone bases and coatings

    1.24.11. Washing of soil-bitumen and soil-cement bases and coatings

    1.24.12. Paving of natural stone coatings

    1.25. What is the required SRO clearance for a deputy? Work with the organization of everyday life, reconstruction and major repairs by a contractor or a contractor, which occurs under a contract with a legal entity or an individual enterprise (general contractor), for which SRO approval is not required :

    1.25.1. Enterprises and light industries

    1.25.2. Enterprises and objects of the grub industry

    1.25.3. Enterprises and objects of the agricultural and forestry dominion

    1.25.4. Enterprises and public transport facilities

    1.26. Future engineering:

    1.26.1. Folding koshtoris for everyday life and rozrakhunki koshtoris warosti of the object

    SUPPLEMENT No. 2

    ROBOTICS OF BUDIVNITSVA, RECONSTRUCTION AND OVERHAUL REPAIRS OF BUDIVNITSVA OBJECTS, WHICH WORK INCLUDING ON THE ADVANCED FACILITIES, Deputy NOT MY PRACTICE

    • functioning of a garage on a land plot, assigned to an individual for purposes not related to the implementation of business activities, or life on a land plot, assigned to maintain gardens nitstva, dacha dominion (Objects for which it is not necessary to obtain a permit for everyday life is subject to part 17 Article 51 of the Local Code of the Russian Federation);
    • work, reconstruction of objects that are capital buildings (kiosks, hangings, etc.) (Objects for which it is not necessary to obtain permission for work must be completed to Part 1 7 Article 51 of the Local Code of the Russian Federation);
    • work on the land plot will be subject to additional disputes (objectives for which do not require permission to work are subject to Part 17 of Article 51 of the Local Code of the Russian Federation);
    • changes in capital infrastructure facilities and (or) their parts, as long as such changes do not interfere with the design and other characteristics of their reliability and safety and do not exceed the boundary parameters of permitted maintenance, reconstruction, installation and local regulations (Objects for which permission is not required everyday life is consistent with Part 17 of Article 51 of the Local Code of the Russian Federation);
    • in other cases, as is consistent with the Local Code of the Russian Federation, the legislation of the constituent entities of the Russian Federation on local activity does not require the withdrawal of permission for everyday activity (Objects for those not The requirement to obtain permission to carry out activities is in accordance with Part 17 of Article 51 of the Local Code of the Russian Federation);
    • objects of individual residential housing (besides residential buildings with a number of surfaces no more than three, intended for residence of no more than two families) (P. 2 of the Order of the Ministry of Regional Development of Russia of the Russian Federation dated 30 June 2009 N 624);
    • living cabins with a number of surfaces, no more than three, which are made up of several blocks, the number of which does not exceed ten and skins for any purpose for living one family, there is a back wall (wall no walls) without cuts from the jug block or jug ​​blocks, ripples on the adjacent land plot there may be access to the territory of zagalny koristuvannaya (living booths of blocked oblivion) ​​(Clause 2 of the Order of the Ministry of Regional Development of the Russian Federation dated 30 April 2009 N 624);
    • There are a large number of apartment booths with a number of surfaces, no more than three, which are formed from one or several block sections, the number of which does not exceed, although each of them has a number of apartments and a living room. koristuvannaya and kozhna za yakhi mає okremij pod'izd with access to the territory of the outskirts koristuvannya (Clause 2 of the Order of the Ministry of Regional Development of the Russian Federation dated 30 April 2009 N 624)


    2.1. What is the required SRO approval for earthling robots? Earth robots that do not require SRO approval:

    2.1.1. Digestion of soil using hydromechanization method.

    2.1.2. Works on piece freezing of soils.

    2.1.3. Mechanized fluffing and breaking up of permafrost soils.

    2.1.4. Laying drainage pipes on building maidans.

    2.2. Palov robots. Securing ground:

    2.2.1. Fawn robots that emerge from the earth, including in sea and river minds.

    2.2.2. Fawn robots that grow in frozen and permafrost soils.

    2.2.3. Grillage cleaning.

    2.2.4. Welding of hammered and drilled fingers.

    2.2.5. Thermal change of soils.

    2.2.6. Cementation of soil bases due to clogged injectors.

    2.2.7. Silication and resinization of soils.

    2.2.8. Wedged and raised steel and tongue and groove pins.

    2.3. Washing of concrete and reinforced concrete monolithic structures:

    2.3.1. Formwork robots.

    2.3.2. Valve robots

    2.3.3. Washing of monolithic concrete and reinforced concrete structures.

    2.4. Installation of precast concrete and reinforced concrete structures:

    2.4.1. Installation of foundations and the structure of the underground part was carried out with great precision.

    2.4.2. Installation of structural elements of the above-ground part was carried out in a variety of ways, including columns, frames, crossbars, trusses, beams, slabs, chords, wall panels and partitions.

    2.4.3. Installation of volumetric units, including ventilation units, elevator shafts and sewer lines, sanitary and technical cabins.

    2.5. Installation of metal structures:

    2.5.1. Installation, reinforcement and dismantling of structural elements and gardening structures of budivel and sporuds.

    2.5.2. Installation, strengthening and dismantling of tank structures.

    2.5.3. Installation, installation and dismantling of goldfinch spores, vezhas, and tension pipes.

    2.5.4. Installation, strengthening and dismantling of technological structures.

    2.5.5. Installation and dismantling of cable-supported structures (braced structures, cable-stayed structures and others).

    2.6. Protection of civil structures, pipelines and equipment (including main and industrial pipelines):

    2.6.1. Foot robots.

    2.6.2. Masonry with acid-trimming targets and shaped acid-trimming ceramic tiles.

    2.6.3. Humuvannya (lining with leaf gums and rare gum sums).

    2.6.4. Wash the adhesive insulation.

    2.6.5. Washing of metallization coatings.

    2.6.6. Applying a facial coating with a wet monolithic substrate in areas with aggressive media.

    2.6.7. Antiseptic treatment of wooden structures.

    2.6.8. Waterproofing of building structures.

    2.6.9. Works with thermal insulation were built, with good design and equipment.

    2.6.10. Robots with the best possible designs and ownership.

    2.7. Control of internal engineering systems and equipment development (at designated facilities):

    2.7.1. Installation and dismantling of the gas supply system (for the evidence of the fakhivtsa, which was allowed to Rostekhnaglyad on this type of activity).

    2.8. Installation work (at the specified sites):

    2.8.1. Installation of lifting and transport equipment.

    2.8.2. Installation of elevators

    2.8.3. Installation of a boiler room.

    2.8.4. Installation of water intake equipment, sewerage and purification systems.


    2.9. What is the required SRO approval with routine control? Work for this purpose is to carry out thorough control of the individual accountant or the assistant on the basis of the contract, a legal entity or an individual entrepreneur (at designated property objects), where the admission of an SRO is not required:

    2.9.1. Close monitoring of security robots.

    2.9.2. Close monitoring of robots in the room for heat and gas supply and ventilation.

    2.9.3. Supervisory control over robots in the field of fire safety.

    2.10. Work with the organization of everyday life, reconstruction and major repairs by a contractor or a contractor, which turns out to be on the basis of a contract with a legal entity or an individual entrepreneur (general contractor) (at designated construction sites ):

    2.10.1. Living and civil life.

    2.10.2. Heat supply systems.

    2.10.3. Gas supply systems.

    2.10.4. Water supply and sewerage systems.

    It doesn’t matter whether your company is registered and operating in Moscow or another sub-subject of the Russian Federation, mandatory membership in the SRO is the same for all agents who work in the construction, design, and visualization spheres . Back in 2010, the Institute of Self-Regulation changed the need to revoke business licenses. But for rich people in business, nutrition is still a problem: who can join the NP, and for whom is the compulsory part of the SRO not required?

    Do you still need permission?

    A self-regulatory organization provides approval for the necessary control of complex and unsafe objects. If your company is engaged in a combination of three surfaces and other commercial, rather than private, everyday activities, food and the obligation to enter into a self-regulatory organization in everyday life, there is no need to feel guilty. You need to join an SRO, otherwise your business will be involved in illegal and illegal activities.

    Do you need to join before the SRO?

    In order to check which types of work require permission and which do not, refer to Federal Law 315-FZ, which regulates NP. There, all the robots that require special permission are described in detail, and a list of those robots is outlined that will not be used.

    For whom is joining obligatory?

    Self-regulation has become a new practice for Russia, so entrepreneurs are no longer in doubt about the need for entry into SRO. Also, work is still carried out that does not require special permission, for example, construction, façade, cladding, road construction and others. Let's not forget about the work, so as not to interfere with the security of life and health. Now and then, the most careless and complex everyday life will require explicit permission. So, if your company intends to legally sell in everyday life and poor people, food “Why do you need to enter the SRO?” There is no positive evidence.

    Today, many alarm workers are asked whether it is necessary to join an SRO or not. Let's try to find out clearly if the information from this drive has been disseminated.

    Before us, like before lawyers, the labor force of construction companies often comes into being, assembling various other work at construction sites, with one single principle: “Why is it obligatory for our company to enter into SRO? How can we work without an SRO Permit for daily work?” Confirmation - Yes, you can, as you:

    1. There will be a garage on a land plot assigned to a physical person.
    2. Be on land supply, assignments for gardening, dacha dominion;
    3. You will be reconstructing objects that are capital utility objects (kiosks, sheds and others);
    4. Be active and vigilant;
    5. Change the objects of capital everyday life and (or) their parts, unless such changes do not interfere with the design or other characteristics of their reliability and safety, do not violate the rights of third parties and do not exceed the boundary parameters of what is permitted everyday life, reconstruction, establishment of local regulations;
    6. Stay close to your living quarters. The number of surfaces on this one is more than three. There are no more than two families to accommodate;
    7. Stay close to your living quarters. The number of surfaces on this one is more than three. The booths can be made up of several blocks, but no more than ten. Leather from blocks, intended for living in one family. The same applies to the back wall(s) without openings from the seat block(s). The living block of roztashovatsya on the edge of the land plot and may go out onto the territory of the zagalnogo korystuvannaya.
    8. Have a lot of apartments. The number of surfaces is no more than three. The booth consists of one or several block sections, or no more. The skin block section has a number of apartments and a barn room. The skin block section is adjacent to the exit to the territory of the sterilization area.
    9. Complete the following works (including renovations, renovations and major overhauls):

    • clause 1.1 Dividing robots in the production process;
    • clause 1.2 Geodetic control of the accuracy of geometric parameters of construction sites;
    • Clause 2.1 Disassembly (dismantling) of spores, walls, ceilings, marches and other structural elements and associated elements or their parts;
    • p.2.2 Hours' routine: roads; Maidanchikov; engineering measures and disputes;
    • clause 2.4 Installation and dismantling of external and internal inventory, technological plumbing;
    • clause 3.1 Soil excavation is mechanized;
    • clause 3.5 Strengthening the soil with compactors, compaction machines or important rammers;
    • clause 9.1 The construction was made from natural and piece stone, including facings;
    • clause 9.2 Vashtuvannya design with purpose, including with facing;
    • clause 9.3 Vlashtuvannya of scorching furnaces and fireplaces;
    • clause 11.1 Installation, strengthening and dismantling of structural elements and fence structures of the building and sporads, including those with glued structures;
    • clause 11.2 Folding of living and huge buildings from parts of factory-prepared complete installation;
    • clause 12.3 Zahisne coating with lacquer materials;
    • clause 12.11 Works on thermal insulation of pipelines;
    • clause 13.1 Washing of roofing made from piece and sheet materials;
    • clause 13.2 Washing of roofing from roll materials;
    • clause 13.1 Washing of self-leveling coatings;
    • clause 14.1 Coating the surface with natural and piece stones;
    • clause 14.2 Inspection of ventilated facades;
    • clause 15.1 Cleaning and dismantling of the water supply and sewerage systems;
    • clause 15.2 Vlashtuvannya and dismantling of the scorching system;
    • clause 15.4 Cleaning and dismantling of the ventilation and air conditioning system;
    • clause 15.5 Electrical system control;
    • clause 15.6 Control of electrical and other measures for controlling life safety systems of households and disputes;
    • clause 20.1 Vlashtuvannya electrical supply voltage up to 1 kV inclusive;
    • clause 20.13 Control of external line communications, including telephone, radio and television;
    • clause 23.5 Installation of compressor units, pumps and fans;
    • clause 23.6 Installation of electrical installations, equipment, automation and alarm systems;
    • clause 23.24 Installation of equipment for food processing enterprises;
    • clause 23.27 Installation of cinematography facilities;
    • clause 23.28 Installation of equipment for electronic production and industrial connection;
    • clause 23.29 Installation of equipment for health protection and medical industry;
    • p.23.30 Installation of agricultural production facilities, including fish processing and fish preservation;
    • clause 23.31 Installation of equipment for household service enterprises and municipal government;
    • p.23.33 Installation of equipment for sporuds;
    • clause 24.7 Commissioning of automation robots in electrical systems;
    • clause 24.10 Commissioning of automation systems, alarm systems and interconnecting devices;
    • clause 24.11 Commissioning robots of autonomous adjustment of systems;
    • clause 24.12 Commissioning and commissioning of integrated systems;
    • clause 24.13 Commissioning robots of telemechanics functions;
    • clause 24.14 Improvement of ventilation and air conditioning systems;
    • clause 24.18 Commissioning of refrigeration units;
    • clause 24.21 Commissioning of hot water heating boilers;
    • clause 24.22 Commissioning of boiler and auxiliary equipment;

    Well, that's robots do not require the approval of the SRO, since they are not carried out on particularly unsafe, technically complex or unique objects. If the performed work is carried out on particularly unsafe, technically complex and unique objects, then the SRO’s approval is obligatory. If you need to join the SRO Budivelniki, it is recommended to speed up the development of the vartosti.

    Below the stench is overdone:

    1) nuclear energy facilities (including nuclear installations, storage facilities for nuclear materials and radioactive waste);
    2) hydraulic equipment of the first and other classes, which are established in accordance with legislation on the safety of hydraulic equipment;
    3) line-cable connections and connections that are designated according to the legislation of the Russian Federation;
    4) power transmission lines and other objects of the electrical power supply system with a voltage of 330 kilovolts or more;
    5) objects of space infrastructure;
    6) airports and other aviation infrastructure facilities;
    7) infrastructure facilities for urban transport;
    8) metro;
    9) sea ports, including specialized sea ports intended for servicing sports and recreational vessels;
    10) thermal power plants with a capacity of 150 megawatts or more;
    11) unsafe industrial facilities, such as:
    * To go out, to get involved, to rework, to hide, to save, to be transported, to find dangerous words in quantities that exceed the border. Such words and the borderline number of unsafe speeches are clearly prescribed in Appendices 1 and 2 to the Federal Law dated June 21, 1997 N 116-FZ "On industrial safety of unsafe manufacturing facilities"
    Do not rely on particularly unsafe and technically foldable objects of gas distribution systems on which natural gas is stored, stored, and transported under pressure up to 1.2 megapascals inclusive, or where hydrocarbon gas is stored under pressure up to 1.6 megapascals inclusive;
    * To produce melts of ferrous and colored metals and alloys based on these melts;
    * work is being carried out in the mining industry, work in the cultivation of brown copal trees, as well as work in the underground mines;
    * permanently installed cable cars and funiculars are used.

    Reach unique objects :
    capital projects, the design documentation of which would like to have one of the following characteristics:
    1) height greater than or below 100 meters;
    2) spill over 100 meters;
    3) visibility of the console greater than 20 meters;
    4) burial of the underground part (in whole or in part) below the planned level of the earth, more than below by 10 meters;
    5) the presence of design and structural systems that require the integration of non-standard methods of development with the coordination of physical and geometric non-linear forces, or the development of special methods of development.

    If you don’t see any types of jobs on the lists of jobs that don’t require SRO approval, if you quit, then you need to join the SRO.

    P. 1-5 (Part 17 of Article 51 of the Local Code of the Russian Federation)
    P. 7-9 (Order No. 624 of the Ministry of Register of Development of the Russian Federation dated December 30, 2009)
    Particularly unsafe, technically complex and unique objects are subject to Article 48.1 of the Central Committee of Ukraine.
    If, after reading the article, you understand that SRO approval is necessary for your company, we can quickly confirm

    SRO is a whole type of non-profit organization that unites legal and physical entities of the economy behind the Galouze mark. The purposes of such ideas are:

    SROs take over the functions of the licensing authority (the license is replaced by the certificate of approval of the SRO); act as an authority for internal selection and regulation (in order to enter the SRO, the subject of government is required to comply with all possible conditions); to steal the interests of the terminal partner (for the purpose of creating compensation funds); to ensure the protection of the interests of enterprises that have entered into such associations and others.

    Economic and legal essence of SRO

    From the point of view of the SRO economy, this is a modern form of the ancient mechanism of the Galusians and “guilds” that ensure the maintenance of the level of quality of products and services that regulate competition among the Galusians, which protect their members iv. All these functions (as well as in other ways) have been built on the eyelashes in the past, so the SRO formula is not new at all, but rather a recent modification of a long-established mechanism.

    The idea of ​​self-regulation lies in the fact that companies, having united in one SRO, do not tolerate among their members those subjects of government activity that do not ensure proper balance of integrity and allow gross violations in the technical process, cast a shadow on the reputation of the entire company. This is all true, unfortunately, not all SROs – some of them function purely formally, without any real regulation.

    Obov'yazkovi SRO (SROS, SROP, SROI etc.)

    There are especially a lot of formal SROs in these countries, and, for example, entry to the SRO in Moscow has a comprehensive mental understanding of one other type of activity: in everyday life, design, and engineering research. The fragments of input before them are a binding mental concomitant of one or another type of activity, which creates a fertile ground for all kinds of speculation. Having actually replaced the holder of a license, such SROs did not address the main shortcomings of licensing regulation: it is possible to revoke access without proper possession, the required number of qualified personnel and the necessity noi make a contribution to the compensation fund. Insanely, there is no longer a part of the SRO, and one can be confident that soon such formal SROs will be dissolved, and their permissions will be withdrawn.

    Where do you need an SRO at this hour? In the field of capital projects (SROS), in their design (SROP), in engineering (SROI), in the field of energy audit (SROE), assessment activities (SROO), audit (SROA), among electronic operators danchikov ta in.

    All obligatory SROs are characterized by the presence of a contribution to the compensation fund, the minimum amount of which is established by law. For voluntary SROs, a compensation fund is not created. In this case, many SROs, which today are deprived of voluntary benefits, have the prospect of becoming obligatory, which will cause the collapse of compensation funds. So, for example, in the near future there will be a decline in compulsory self-regulation in the fire safety sector, which will replace the state licensing system.

    Voluntary SRO

    A characteristic feature of such self-regulatory organizations is the presence of a compulsory compensation fund. This is a type of SRO, but it is not obligatory to become a member in order to eliminate the ability to perform singing activity. Such SROs do not have permissions, but serve as non-commercial organizations of the reputational, status type.

    The following can be considered as voluntary SROs: SROs in the advertising industry, SROs of professional participants of the Republican Central Bank, SROs of industrial enterprises and others.

    Galuzev Ob'yazkov SRO: what are the blame?

    Since joining the SRO is an obligatory requirement for any other type of activity, the natural question arises: “Why aren’t there any culprits here?” We’ll talk about such accusations below.

    Who needs and who doesn't need CPOS approval?

    Construction, reconstruction, overhaul - a variety of types of activities that require the admission of everyday SROs are very wide. What is the need for an SRO in the everyday life? And for literally everything: from excavation and preparatory work to the commissioning of mining operations. A high level of clearance is required for the general contractor as the main subordinate person on the project. There are also special permits for particularly unsafe robots, robots with unsafe or non-standard objects, and others.

    To put it simply, there is no need for CPOS. What is the required clearance, how will you be in control? Did you ask susida to help make the lazna? How does your company deal with cottage furniture? How did you get hired as a contractor for a major renovation of a school? What are your plans for the reconstruction of the three-surface medicine room? For happiness no! Construction, reconstruction and overhaul of cottages, non-residential buildings and residential housing stock of up to 3 units, including SROS approval (and, therefore, entry before SROS) does not require.

    Also, the entire transfer of work does not require a special CPOS approval, since we are not talking about particularly unsafe objects, objects of advanced technical complexity and unique objects (generally severely need SRO).

    Objects of advanced safety include nuclear power facilities, hydrotechnical facilities of the 1st and 2nd safety classes, communication and cable transmission lines, electrical power facilities and transmission lines (in d 330 volts and higher), about Aviation and space ports, important infrastructure, metro, TES of 150 megawatts, great sea ports.

    Unique objects are considered to be capped objects with (at a minimum) one of the unique figures: height above 100 m, visibility of spills above 100 m, visibility of the console above 20 m, underground Part of the object moves more than 10 m at depth, constructive folding (non-standard methods of folding, special techniques, etc.).

    If you do not have the desired relationship with such objects, then you do not need the CPOS approval for the assigned work, marked “*” for the Perelik types of work (for the specific classifier).

    Who needs and who doesn't need an SROP permit?

    The design faces a similar situation: since there are no unique, technologically advanced or unsafe objects, low performance does not require special permission in the design. This includes the design of internal electrical lines, the design of internal low-current lines, landscape design and design, interior design, storage of curtain documents, geodetic monitoring, etc.

    In addition, the SROP approval is not required, since the design will fit into the surface limit regulations. So, for example, you do not need permission to develop a project for a private garage, additional buildings in the garden plot (bathhouses, sheds), kiosks, private booths with a surface of no more than three surfaces, a large number of apartment booths with a surface no more than three surfaces.

    Who needs and who doesn't need a CPO permit?

    In the field of engineering research, there is a shift in work that does not require permission, since there are no concerns about unsafe or non-standard objects, even in the area, and there is, in essence, one point that there is a need for environmental engineering Event: investigation of the territory of the transported work area for sanitary epidemiological situation, medical and biological situation, monitoring of local flora and fauna. All other types of work included in the list require admission regardless of the object’s performance, but again, engineering investigations that require low-level, cottage and auxiliary work.

    This is primarily due to the fact that when it comes to engineering research, the work carried out has a basic, main contribution to both project and day-to-day work. Therefore, the CPO approval is practically necessary for any planned transfer of work (regardless of the object class).

    Share with friends or save for yourself:

    Vantaged...